Sl. No.
|
Proj. No.
|
Project Description
|
Client
|
Consulting Engineer
|
Product
|
Contractor
|
Approval Date
|
Remarks
|
|
1
|
CP 677
|
DFC 0363 - Doha and Rayyan Sewerage PS 3, 18 Area Sewerage |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
Maunsell Consutalncy Services Ltd.
|
RC/GRP Lined Jacking Pipe(800 mm, SN 10000)
|
Al Waha Est. for Contg. & Trdg.
|
15.09.2002
|
||
2
|
CP 623
|
Project Code DFC 0336, Doha and Rayyan Sewerage Abu Hamour Area Pumping Station |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
ASCO Consulting Engineers
|
GRP/Reinforced Concrete Pipe 700 1000 mm dia.
|
Alwaha Est. for Contg. & Trdg.
|
05.04.2003
|
||
3
|
CP 394
|
Industrial Area Sewerage Phase 1 |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
KEO International Consultants
|
RC Pipe with GRP Lining (DN 600 mm, SN 10000)
|
Qatar Building Co.
|
06.04.2003
|
||
4
|
-
|
General |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
N.A.
|
GRP Pipes & Fittings (DN 1200mm, SN 5000)
|
General
|
04.05.2003
|
||
5
|
MW-AF-127-2002-119
|
MW-AF-127-2002-119 |
UAE Armed Force
|
Stanly Consultants
|
GRP Pipes & Fittings, 300mm, 450mm, 600mm & 1000mm
|
Bin Hafeez Est.
|
27.05.2003
|
||
6
|
ADSS 724
|
Sewerage of Al Shamkha - Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
Manhole GRP Liners and Components *(Liner Shaft 1500 & 2000 mm)
|
Bin Hafeez Est.
|
29.05.2003
|
||
7
|
A 174/2003
|
Twin DN1400mm Pipelines from Ghomadh South to Al Ain Reception |
Pvt. Dept. for H.H. Shaikh Zayed Bin Sultan Al Nahyan
|
Tebodin Middle East Ltd.
|
GRP Pipes & Fittings (DN 1400mm, SN 10000)
|
Al Nasr Irrigation & Contg. Co.
|
01.06.2003
|
||
8
|
-
|
General |
Abu Dhabi Water & Electricity Authority
|
N.A.
|
FRP/GRP Pipes (All sizes)
|
General
|
17.06.2003
|
||
9
|
Tender D4116
|
|
Abu Dhabi Water & Electricity Authority
|
Italconsult
|
GRP Pipes & Fittings
|
General
|
N.A.
|
Included in the Tender Documents.
|
|
10
|
JAP 05
|
Jumeirah Islands Package 6, External Pipelines |
Jebel Ali Properties
|
ACE International
|
GRP Pipes & Fittings (350, 450 & 600mm DN, SN 10000)
|
Hedley International Emirates Contracting LLC
|
14.07.2003
|
||
11
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Pipes (DN1400mm, SN 10000)
|
Bin Hafeez Est.
|
10.08.2003
|
||
12
|
JAP 015/2
|
China Town - JAP 015/2, Package 2 - Infrastructure |
Nakheel
|
ACE International
|
GRP Pipes & Fittings*
|
Hedley International Emirates Contracting LLC
|
08.09.2003
|
||
13
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Pipes (All sizes and Ratings)
|
Bin Hafeez Est.
|
06.10.2003
|
||
14
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Pipes (DN 450mm, SN 10000)
|
Bin Hafeez Est.
|
19.08.2003
|
||
15
|
-
|
Khuzam Road in Ras Al Khaimah |
Ministry of Public Works & Housing, RAK
|
Jouzy and Partners
|
GRP Pipes (DN 1200mm, SN 5000)
|
Al Nuaimi Group
|
08.03.2004
|
||
16
|
-
|
General |
N.A.
|
Arab Center for Engg. Studies
|
GRP Pipes for the use in Potable Water Transmission
|
General
|
25.04.2004
|
||
17
|
Contract 1B
|
Rehabilitation, Upgrading & Widening of Abu Dhabi -Dubai Road Cont. 1B |
Emirate of Abu Dhabi, Works Dept.
|
Parkman Consultants
|
GRP Pipes & Fittings (DN 400mm, SN 2500 for Pipes and all sizes Fittings)
|
Bin Hafeez Est.
|
01.06.2004
|
||
18
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Sealing Plate
|
Bin Hafeez Est.
|
12.07.2004
|
||
19
|
JAP015/2
|
China Town - JAP 015/2, Package 2 - Infrastructure |
Nakheel
|
ACE International
|
GRP Sealing Plate
|
Hedley International Emirates Contracting LLC
|
24.07.2004
|
||
20
|
JAP015/2
|
China Town - JAP 015/2, Package 2 - Infrastructure |
Nakheel
|
ACE International
|
GRP Pipes + Fittings
|
Hedley International Emirates Contracting LLC
|
04.09.2004
|
||
21
|
-
|
Vendor List |
N.A.
|
Tebodin Mmiddle East Ltd.
|
GRP Pipes and Fittings
|
General
|
01.11.2004
|
||
22
|
ADSS 728
|
Sewerage at Al Shamkha - Phase 6 |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Pipes and Fittings
|
Bin Hafeez Est.
|
08.11.2004
|
||
23
|
ADSS 728
|
Sewerage at Al Shamkha - Phase 6 |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Sealing Plate
|
Bin Hafeez Est.
|
08.11.2004
|
||
24
|
-
|
Widening the road between Shawamekh Roundabout and Zayed Military City at Abu Dhabi / Sweihan Road |
Emirate of Abu Dhabi, Works Dept.
|
Maunsell Consutalncy Services Ltd.
|
GRP Pipes & Fittings
|
Bin Hafeez Est.
|
09.12.2004
|
||
25
|
-
|
Al Maha Forest Pump Station |
Private Dept. for h.h. Sh. Zayed Bin Sultan Al Nahyan
|
Italconsult
|
GRP Lining of Manholes
|
Societe Egyptienne D'Enteprises (SEDE)
|
11.12.2004
|
||
26
|
ADSS 728
|
Sewerage at Al Shamkha - Phase 6 |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Over Laminated Grab Bar, Ladder, Stanchion and Step Rungs
|
Bin Hafeez Est.
|
05.01.2005
|
||
27
|
Contract 1B
|
Rehabilitation, Upgrading & Widening of Abu Dhabi -Dubai Road Cont. 1B |
ADWEA - Abu Dhabi Transmission & Despatch Co. (TRANSCO)
|
Tebodin Middle East Ltd.
|
GRP Pipes
|
Bin Hafeez Est.
|
11.01.2005
|
||
28
|
JAP 015/2
|
China Town - JAP 015/2, Package 2 - Infrastructure |
Nakheel
|
Associated Consulting Engineers (ACE) International
|
GRP Fittings
|
Hedley International Emirates Contracting LLC
|
27.01.2005
|
||
29
|
Contract 1B
|
Rehabilitation, Upgrading & Widening of Abu Dhabi -Dubai Road Cont. 1B |
Emirate of Abu Dhabi, Municipalities & Agriculture Dept. Works
|
Tebodin Middle East Ltd.
|
GRP Pipes
|
Bin Hafeez Est.
|
12.02.2005
|
||
30
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
Montgomery WATSON Harza
|
GRP Pipes
|
Bin Hafeez Est.
|
02.04.2005
|
Strain Corrosion Test Report
|
|
31
|
MW-RG-246-2004
|
Maintenance and Renovation of Waer Supply and Irrigation Networks at Camp Sheikh Khalifa Palace |
Directorate of Military Works
|
GRP Pipes
|
Tankline Co. L.L.C.
|
10.05.2005
|
|||
32
|
ADSS 809
|
Sewerage and Surface Water Drainage Networks at Mohd. Bin Zayed Residential City and Mussafah East (Phase 10) |
Abu Dhabi Mun. & Town Plng. Sewerage Projects Committee
|
ACE International
|
GRP Manhole Liner**
|
Abu Dhabi Maintenance & Construction Co. (ADMAC)
|
11.05.2005
|
||
33
|
3M/04/2
|
Laying of D.I. & A.C. Pipelines in Northern Emirates |
Federal Electricity & Water Authority
|
GRP Fittings
|
Tecton Engg. & Construction LLC
|
18.06.2005
|
|||
34
|
Development of Airport Road - Al Matar Street |
Qatar Roads Affairs, Main Projects Division
|
Conser
|
GRP Pipes
|
Qatar Building Co.
|
16.08.2005
|
|||
35
|
CP411
|
Project DFC 0315, Wakrah and Wukair Sewerage PS W2 and W7 Area Sewerage |
Dr. AAW Consulting Engineers
|
GRP Pipes with concretre surround for ID 500mm, 600mm
|
Alwaha Cont. & Trading Co. WLL
|
17.09.2005
|
|||
36
|
Development of Road from Inter-Continental R/A to Khatim Al Shakla R/A |
Govt. of Abu Dhabi - Al Ain Municipality
|
Maunsell Consutalncy Services Ltd.
|
GRP Pipes & Fittings
|
Bin Hafeez Est.
|
29.10.2005
|
|||
37
|
4M/04
|
R.O. Desalination Plants at New Qidfa (Fujairah) & Al-Zawrah (Ajman) |
Federal Electricity & Water Authority
|
GRP Pipes & Fittings
|
Tecton Engg. & Construction LLC
|
20.11.2005
|
|||
38
|
JAP 015/2
|
International City JAP 015/2 - Infrastructure |
Nakheel
|
ACE International
|
GRE Fittings
|
Hedley International Emirates Contracting LLC
|
22.11.2005
|
||
39
|
CM 901
|
Refurbishment of Jau, Askar & South Alba STPs |
Ministry of Works & Housing - SE - OMD
|
Khatib & Alami - Fakhro
|
RTR Pipes & Fittings
|
Nass Contracting (Al Madar Trading)
|
14.12.2005
|
||
40
|
CP 451
|
Doha & Rayyan Sewerage - Construction of Garafa Trunk Sewer - Phase 1 |
Public Works Authority, Drainage Affairs, Qatar
|
GRP Short Pipes
|
Al Huda Engg Works
|
06.02.2006
|
|||
41
|
3EM/2006
|
Laying of D.I. & A.C. Pipelines in Northern Emirates |
Federal Electricity & Water Authority
|
G.R.P. Bend
|
Direct
|
06.02.2006
|
|||
42
|
ADSS 223
|
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3 |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
GRP Pipes & Fittings
|
Bin Hafeez Est.
|
06.02.2006
|
||
43
|
-
|
PGD Contracts |
Abu Dhabi Municipality, Dept. of Agriculture & Municipalities
|
-
|
GRP Pipes - Pipe Long Term Tests (Hydrostatic Design Basis & Strain Corrosion Test)
|
-
|
11.03.2006
|
||
44
|
ADSS 223
|
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3 |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
GRP Manhole Liner and Components
|
Bin Hafeez Est.
|
13.03.2006
|
||
45
|
ADSS 223
|
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3 |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
GRP Sealing Plate
|
Bin Hafeez Est.
|
19.04.2006
|
||
46
|
1M/2005(A)
|
4 MIG and 2 MIG, R.C.C. Ground Water Tanks at RAK and Ajman |
Federal Electricity & Water Authority
|
-
|
GRP Pipes & Fittings
|
Essa Engg & Marine Services L.L.C.
|
30.04.2006
|
||
47
|
Contract 3
|
Shaikh Zayed Bridge |
Emirate of Abu Dhabi, Works Dept.
|
-
|
GRP Pipes
|
Archirodon Construction (Overseas) Co. S.A.
|
17.05.2006
|
||
48
|
1M/05(B)
|
4 MIG and 2 MIG, R.C.C. Ground Water Tanks at RAK and Ajman |
Federal Electricity & Water Authority
|
-
|
GRP Pipes & Fittings
|
Tecton Engg. & Construction LLC
|
10.05.2006
|
||
49
|
MW-OU-1999-2005
|
N/A |
Directorate of Military Works
|
-
|
GRP Pipes & Fittings (600mm)
|
Tankline Co. L.L.C.
|
31.05.2006
|
||
50
|
-
|
The Pearl - Qatar |
United Developent Company UDC
|
Dar Al-Handasah
|
GRP Pipes & Fittings
|
J&P (Overseas) Ltd.
|
04.06.2006
|
||
51
|
ADSS 731
|
Sewerage of Al Falah (Phase 3) & Al Shamkha (Phase 7) |
Government of Abu Dhabi - Sewerage Directorate
|
Montgomery WATSON Harza
|
GRP Sealing Plate
|
Bin Hafeez Est.
|
10.06.2006
|
||
52
|
-
|
Registration & Prequalification |
TAKREER
|
N/A
|
RTRP (GRP/GRE/GRV Etc.)
|
Direct
|
21.06.2006
|
||
53
|
-
|
Al Seef Sewerage & Drainage Scheme Phase-I |
Ministry of Works and Housing, Bahrain
|
N/A
|
GRP Pipe 600mm dia. & 400mm dia. Coupling
|
International Trading House
|
26.06.2006
|
||
54
|
-
|
General |
Ministry of Works and Housing, Bahrain
|
N/A
|
GRP Pipes and Double Bell Coupling
|
International Trading House
|
18.07.2006
|
||
55
|
-
|
Sharjah Sewage Treatment Works - Phase 7 |
Sharjah Municipality
|
Halcrow Int'l Partnership
|
GRP Pipes & Fittings
|
Six Construct
|
28.10.2006
|
||
56
|
-
|
Jebel Ali New Container Terminal Stage 1 LCC2 & LCC3 Upland Facilities |
Dubai Ports Authority / Jebel Ali Free Zone Authority, Civil Eng. Dept.
|
Soctt Wilson, Kirkpatrick & Co. Ltd.
|
GRP Pipes & Fittings
|
Hyundai Eng. Const. Co. Ltd.
|
06.11.2006
|
||
57
|
-
|
Riffa Views Project Package EW 2400 - Diversions |
N/A
|
Hyder Consulting
|
GRP Pipes
|
AlKomed Engg. Services (Al Madar)
|
16.11.2006
|
||
58
|
-
|
Vendor Registration |
Qatar Petroleum
|
N/A
|
GRP Pipe & Fitting
|
N/A
|
29.11.2006
|
||
59
|
Contract 1B
|
Rehabilitation, Upgrading & Widening of Abu Dhabi -Dubai Road Cont. 1B |
Emirate of Abu Dhabi, Works Dept.
|
Parkman Consultants
|
Removable GRP cover for bridgr bearings
|
Bin Hafeez Est.
|
14.05.2007
|
||
60
|
-
|
N/A |
FEWA
|
FEWA
|
GRP Pipe & Fitting
|
FEWA
|
10.01.2007
|
||
61
|
PD017
|
DS 161 Pumping Station X1 and Its Rising Mains |
Dubai Municipality drainage and irrigation Department
|
ACE-Associated Consulting Engg Int
|
GRP Pipes
|
Hedley International Emirates Contracting LLC
|
03,12,2007
|
DPFC is Supplier
|
|
62
|
-
|
Road Improvement BG, A Ali and Traffic Directorate |
Ministry of Works , PWA
|
N/A
|
GRP Pipes Dia 300 & 400mm dia
|
Haji Hassan Group
|
24.05.2008
|
ITH is Supplier
|
|
63
|
-
|
Riffa Sewerage Scheme Area E% |
Ministry of Works
|
N/A
|
GRP Pipes Dia 400mm
|
Ahmed Mansoor Al Aali Co
|
22,05,2008
|
ITH is Supplier
|
|
64
|
-
|
Stormwater drainage and sewerage system (phase 1) |
Dubai World Central Int'l Airport
|
N/A
|
GRP Pipes & Fittings Dia 150 x 400mm
|
Al Naboodah Engg
|
22,06,2008
|
||
65
|
DS 126
|
Irrigation Mains From Jebel Ali STP Contract No.DS 126 |
Dubai Municipality
|
Alturath Engineering
|
GRP Pipes & Fittings
|
2008
|
|||
66
|
-
|
Engineering Procurement and Construction (EPC) of (2) Two Reverse Osmosis Sea Water Desalination Plants at the Palm Jumeirah |
Nakheel
|
-
|
GRP/GRE Pipe & Fitting
|
ACWA
|
2008
|
||
67
|
Contract No. N035-40-01-C-030
|
Dubai Maritime City - Infrastructure Works fir Industrial Area Precint |
Nakheel
|
Mouchel Parkman
|
GRP Pipe & Fitting
|
Hedley International Emirates Contracting LLC
|
2008
|
||
68
|
Contract No. JAP015/09
|
The Lake Preservation Projects |
Nakheel
|
Lake Preservation Project Consortium (LPPC)
|
GRP Pipe & Fitting
|
Hedley International Emirates Contracting LLC
|
2008
|
||
69
|
-
|
Downtown Jebel Ali Infrastructure Works Zone 1 & 2 |
Limitless LLC
|
Wilbur Smith Associates Inc
|
GRP Pipe & Fitting
|
Hedley International Emirates Contracting LLC
|
2008
|
||
70
|
Contract No. O1105
|
Construction of Pumping Mains & Pressure Mains at Mafraq, Abu Dhabi |
ADSSC
|
AECOM
|
GRP Pipes & Fittings
|
Tecton Engg
|
2009
|
||
71
|
-
|
Al Raha Beach |
Al Dar
|
AECOM
|
GRP Pipes & Fittings
|
AL Dar Laing O'Rourke
|
2008
|
||
72
|
CP - 682/ 3
|
Doha North Sewerage Treatment and Associated Worklot 3 Intercept and Truck Sewer Tunnels in Doha, Qatar |
Ashghal
|
KEO Stanley Consultant
|
GRP Pipes
|
Hedley International Emirates Industrial Projects LLC - Ultra Construction Engg
|
2008
|
||
73
|
Contract No. O1105
|
Construction of Pumping Mains & Pressure Mains at Mafraq, Abu Dhabi |
ADSSC
|
AECOM
|
GRP Pipes & Fittings
|
Tecton Engg
|
2009
|
||
74
|
Contract No. 2
|
A'Seeb Waste water Projects |
Haya Water
|
Parsons
|
GRP Pipes
|
Gulf Petrochemical
|
21,04,2009
|
||
75
|
-
|
West Riffa Sewerage Scheme |
-
|
-
|
GRP Pipes & Fittings
|
International Trading House
|
19.05.2009
|
sample approval
|
* DN 400, 500, 600, 700, 800, 1200mm - SN 5000 and DN 500 - SN 10000 for Pipes and 1000, 1200, 1500 and 1800 mm for Liner Shafts)
** Manhole Liner, Shaft, Base, Coverslab & Grab Bar, Inspection Chambers, Petrol Interceptor, Grease Trap, and Lamination Materials - Vinylestar resin, ECR Glass, Surface Tissue & Flow coat - Vinylester resin.