You are here: Home Industrial Companies Advanced Pipes & Cast Co. RCP Projects and Approval List RCP

Project Approval List - RCP

SR. NO
PROJ. NO.
PROJECT DESCRIPTION
CLIENT
CONSULTANT
PRODUCT
CONTRACTOR
APPROVAL DATE
REMARK
1
ADSS-216/B
Khalifa City 'B' - Surface Water Drainage
Abu Dhabi Municipality - SPC
Acer John Taylor
PVC Lined RC Pipe 2400 mm
Bin Hafeez Est.
12.03.1998
2
C-962
Internal Road Project for Mussafah Industrial Area, Contract No. 962
Abu Dhabi Municipality
Hyder Consulting
R.C. Pipe 2400 mm
Bin Hafeez Est.
08.12.1998
3
ADSS 431
Sewerage & Stormwater Project for New Mussafah East - Phase IV
Abu Dhabi Municipality - SPC
Dorsch Consult
RC Pipe 600 & 1000 mm
Bin Hafeez Est.
21.04.1999
4
ADSS 219/B
Khalifa City B Sewerage Works & Surface Water Truch Lines
Abu Dhabi Municipality - SPC
Hyder Consulting
HDPE Lined RC Pipes 600mm to 2400mm dia.
Nael & Bin Harmal Hydroexport Est.
25.04.1999
5
ADSS 502/1
Sewerage & Surface Drainage System & Facilities at South Shahama Area
Abu Dhabi Municipality - SPC
Parsons International Ltd.
PVC Lined RC Pipes 2400 mm dia.
Bin Hafeez Est.
10.05.1999
6
-
Borouge Petrochemical Project
Borouge (ADNOC)
Various
Precast Concrete Pipe
Al Jaber Energy Service
01.08.1999
7
-
General
Al Ain Municipality
--
R.C. Pipe (Full range)
General
08.02.2000
8
M16A/A
Roads & Sewerage in Mezyad, Al Dhaher & Umm Ghafa Extensions
Al Ain Municipality
Gibb Middle East
RC Pipe 600 mm to 1400 mm dia.
Bin Hafeez Est.
08.05.2000
9
ADSS 515/5
Surface Drainage for Airport Road Interchange, Amiri Flight Road and Gold Course
Abu Dhabi Municipality - SPC
Parsons International Ltd.
HDPE Lined RC Pipe 600 to 1500 mm dia.
Bin Hafeez Est.
12.09.2000
10
ADSS 515/4
Storm Water Drainage along both of Al Ain Road - Second Stage (From Interchange No. 5 to Mafraq Interchange)
Abu Dhabi Municipality - SPC
Parsons International Ltd.
HDPE Lined RC Pipe 600 to 1400 mm dia.
Bin Hafeez Est.
09.04.2001
11
CP 565/1
Project Code DSC 0040, Surface Water Schemes - Abu Hamour Area Drainage - Phase 2
Drainage Dept., Qatar
Khatib & Alami and Metcalf & Eddy International, Inc.
RC Pipe 1300 & 1400 mm
Al Waha Est.
23.08.2001
12
Trip Cont. No. 2015
New Corniche Road East (Stage I) Land Reclamation and Roadworks
Abu Dhabi Municipality
De Leuw, Cather Int'l Ltd.
R.C. Pipe - Dia. 600, 800, 1300 & 1800mm
BM Engineering and Construction Co. Ltd.
14.04.2004
13
-
Dubai World Trade Centre Storm Water Drainage Project
Dubai World Trade Centre
Hyder Consulting
RC Pipe, 600, 800 & 1000 mm dia.
Hedley International Emirates Industrial Projects LLC
11.05.2002
14
-
Dubai World Trade Centre Storm Water Drainage Project
Dubai World Trade Centre
Hyder Consulting
Precast Manholes
Hedley International Emirates Industrial Projects LLC
01.06.2002
15
CP 677
DFC 0363 - Doha and Rayyan Sewerage PS 3, 18 Area Sewerage
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
Maunsell Consultantcy Services Ltd.
RC/GRP Lined Jacking Pipe, 800 mm dia.
Al Waha Est. for Contg. & Trading
15.09.2002
16
CP 393
Project Code DTC 0065, Industrial Area Sewerage Treatment Works
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
Khatib & Alami and Metcalf & Eddy International, Inc.
RC Pipes 1000 mm dia.
Razak Trading & Contracting Co.
04.12.2002
17
ERC 0492/C1
Al Gharrafa Interchange
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
Technital
PVC Lined RC Pipes 700 mm to 1000 mm dia.
J&P (Overseas) Qatar WLL
18.12.2002
18
BP#1C-1
Construction of Roads, Underground Parking, Utility Tunnels and Utilities
Qatar Petroleum
KEO International Consultants
RC Jacking Pipe 1500 mm dia.
Al Darwish Engg/Contrack International Inc. J.V.
26.03.2003
19
Trip Cont. No. 994
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A
Abu Dhabi Municipality
De Leuw, Cather Int'l Ltd.
RC Pipes 800 mm
Bin Hafeez Est.
27.04.2003
20
Trip Cont. No. 994
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A
Abu Dhabi Municipality
De Leuw, Cather Int'l Ltd.
RC Pipes 1800mm
Bin Hafeez Est.
29.04.2003
21
ADSS 724
Sewerage of Al Shamkha, Phase III
Abu Dhabi Municipality
Montgomery Watson Harza
HDPE Liner RC Pipes 2400 mm dia.
Bin Hafeez Est.
05.05.2003
22
ADSS 408/2
Surface Water Drainage from Truck Road to Al Wathba Palace Civil Works (Phase II)
Abu Dhabi Municipality
Dorsch Consult
RC Jacking Pipe 1200 mm dia.
ADMAK
25.05.2003
23
-
Amiri Flight Airfield Expansion Package No. 002 -Apron and Taaxiways
Amiri Flight
Halcrow International partnership
RC Pipes, 600 mm to 1300 mm dia.
Six Construct Co. Ltd.
27.05.2003
24
-
Amiri Flight Airfield Expansion Package No. 002 - Apron & Taxiways
Amiri Flight
Halcrow International partnership
RC Pipes & Manholes
Six Construct Co. Ltd.
27.05.2003
25
-
General
Al Ain Municipality
N.A.
RC Pipes (Full range)
General
02.06.2003
26
-
Amiri Flight Airfield Expansion Package No. 002 - Apron & Taxiways
Amiri Flight
Halcrow International partnership
Precast Manholes 1500 mm dia.
Six Construct Co. Ltd.
03.06.2003
27
Trip Cont. No. 994
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A
Abu Dhabi Municipality
De Leuw, Cather Int'l Ltd.
RC Jacking Pipes 1800mm
Bin Hafeez Est.
03.06.2003
28
-
General
Abu Dhabi Water & Electricity Authority
N.A.
RC Pipes (Full range)
General
17.06.2003
29
CP 565/2
Project Code DSC 0041, Surface Water Schemes - Abu Hamour Area Drainage - Phase 3
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
Khatib & Alami and Metcalf & Eddy International, Inc.
RC Pipe 1200 mm dia.
Qatar Building Co.
22.06.2003
30
-
Jumeriah Islands (Al Nakheel), Package 6, External Pipelines
Jebel Ali Properties
Maunsell Consultantcy Services Ltd.
RC Pipes
Hedley International Emirates Industrial Projects LLC
12.07.2003
31
ADSS 724
Sewerage of Al Shamkha, Phase III
Abu Dhabi Municipality
Montgomery Watson Harza
RC Pipes 2400 mm dia.
Bin Hafeez Est.
12.08.2003
32
JAP005
Jumeirah Islands Project, Package 6, External Pipelines
Jebel Ali Properties
ACE International
Concrete Casing of GRP Pipes 600 mm dia.
Hedley International Emirates Industrial Projects LLC
27.09.2003
33
JAP 015/2
China Town JAP015/2 - Infrastructures Contract Storm Water Drainage System
Nakheel
ACE International
RC Pipes 600, 700, 800 & 1000 mm dia.
Al Nabooda & Bin Hafeez
27.09.2003
34
P353JA
Quay 4 Extension & Berth 21
Nakheel
Cansult Ltd.
RC Pipe 800 mm dia.
Belhasa Six Construct LLC
06.11.2003
35
GTC 225/ED/03
EPC of Dual Carriageway between Umm Bab and Salwa Road
Qatar Petroleum
RC Pipes 1000mm & 1200mm
Galfar Al Misnad Engg & Cont. WLL
11.01.2004
36
Project 2137
Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) - Ruwais
TAKREER
RC Pipes
Al Jaber Energy Service
03.04.2004
37
Project 2137
Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) - Ruwais
TAKREER
RC Jacking Pipes 2400 mm dia.
Al Jaber Energy Service
03.04.2004
38
ADSS 728
Sewerage of Al Shamkha, Phase 6
Abu Dhabi Municipality
Montgomery Watson Harza
Casting, Handling and Erection of Pre-cast Elements.
Bin Hafeez Est.
18.12.2004
39
3M/04/2
Laying of D.I. & A.C. Pipelines in Northern Emirates
FEWA
Precast Cocnrete Pipes for use as pipe culvert
Tecton Engg. & Construction LLC
30.04.2005
40
CP 451
Doha & Rayyan Sewerage Garaffa Trunk Sewer - Phase 1 Contract No. C2005/52
ASCO Consulting Engineers
RC Jacking Pipes
Al Huda Engg. Works (AJECT - Qatar)
28.09.2005
41
Development of Road from Inter-Continental R/A to Khatim Al Shakala R/A
Govt. of Abu Dhabi - Al Ain Municipality
Maunsell Consultantcy Services Ltd.
RC Pipes
Bin Hafeez Est.
29.10.2005
42
ERC 0656/C1
Suhaim Bin Hamed Street
Roads Affairs, Public Works Authority, Main Projects Division, Qatar
Maunsell Consultantcy Services Ltd.
PVC Lined RC Pipes, 2000 mm dia.
Al Jaber Engineering
17.11.2005
43
IRP6089
Inter Refineries Pipelines(IRP)
TAKREER
Tebodin
RC Pipes
Trident Transport
18.12.2005
44
CP 706
Hamad Medical City Surface & Ground Water Scheme
Public Works Authority, Drainage Affars, Qatar
KEO International Consultants
PVC Lined RC Pipes
Al Jaber Engineering
09.01.2006
45
ADSS 223
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3
Government of Abu Dhabi - Sewerage Directorate
Hyder Consulting
R.C. Pipes
Bin Hafeez Est.
06.02.2006
46
ADSS
Relocation of Storm Water Pumping Station RD-G
Government of Abu Dhabi - Sewerage Directorate
Hyder Consulting
R.C. Pipes
Nurol L.L.C.
15.02.2006
47
ADSS 223
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3
Government of Abu Dhabi - Sewerage Directorate
Hyder Consulting
Concrete Pre-cast Units
Bin Hafeez Est.
18.02.2006
48
CP 451
Doha & Rayyan Sewerage Garaffa Trunk Sewer - Phase 1 Contract No. C2005/52
Public Works Authority, Drainage Affars, Qatar
ASCO Consulting Engineers
R.C. Pipes
Al Huda Engg. Works
18.02.2006
49
Cont. 1
Construct, Complete & Maintain the roads in U.A.E. Contract No. 1 - Dhadna, Taween, Khalibeh, Idhen
Ministry of Public Works - Road Dept. and Utilities
Conser Consulting Engg. Services
R.C. Pipes
Saif Bin Darwish
16.05.2006
50
Cont. 1B
Rehabilitation, Upgrading & Widening of Abu Dhabi - Dubai Road, Contract 1B
Works Dept., Emirate of Abu Dhabi
Parkman Consultants
R.C. Pipes
Bin Hafeez Est.
07.06.2006
51
-
Registration & Prequalification
TAKREER
N.A.
R.C. Pipes
Direct
21.06.2006
52
R800-3A
Ras Al Khor Crossing
Roads & Transport Authority Roads Dept.
Parsons, De Leuw Cather Overseas Ltd.
Precast Manhole Systems
Hedley International Emirates Industrial Projects LLC
17.07.2006
53
ERC0638/CIA
Construction of Qatar Primary Routes, North Road Project- Package -1
Ashghal
Dar Al-Handasah
PVC lined Concrete Pipe
Al Darwish Engg.
31.07.2006
54
R800-3A
Ras Al Khor Crossing
Roads & Transport Authority Roads Dept.
Parsons, De Leuw Cather Overseas Ltd.
Precast Drainage Manhole System
Hedley International Emirates Industrial Projects LLC
25.08.2006
55
ERC/1400/D20/C4
Doha Expressway/D Ring road Interchange (Pkg. 4)
Roads Affairs Main Projects Division, Qatar
Ashghal
RC Jacking Pipes
Qatar Building Co. /
08.07.2006
56
ERC/1400/D20/C2
Industrial Interchange
Roads Affairs Main Projects Division, Qatar
Technital
RC jacking pipes
Konstruktor Inzenjering d.d. Split
11.10.06
57
D04110-Pkg. No. 1-N007
Jumeirah Village South II -Infrastructure Works
Ghantoot Gen. Transp. & Cont. Co. (Main Contractor)
Dar Al-Handasah
Junction Box
Reem Cont. Dubai
22.10.06
58
Cont. No. 35-50-01-C0030
Package CP 403 Dubai Maritime City Infrastucture Contract No. 2
Nakheel
Mouchelparkman
Manhole Systgem DIC Chambers
Hedley International Emirates Industrial Projects LLC
30.10.06
59
N/A
22 February Street / Al Amir Street Upgr. & Int. Doha
P.W.A.
Asghal
RC Jacking Pipes
JV Bilfinger Berger - Al Hamed (Tubin )
28.06.06
60
N/A
Central Prison at Sumail
Royal Oman Police - DGPM
Khatib & Alami and Partners
RC Pipes
Galfar Engg. & Cont. LLC
05.11.06
61
N/A
Onshore Gas Dev. Phase III Project, Subcontract No. 25113-000-HC3-P00Z-00002 NGL Pipeline
GASCO
Bechtel
Precast Elements
Punj Lloyd Ltd.
08.11.06
62
N/A
General
Qatar Petroleum
N/A
R.C. / GRP / uPVC Pipes & Fittings
Direct
29.11.06
63
DCA-06-01
EGDS Upgrade Works Project
GASCO
Bechtel
FOC Chambers and Concrete Safety Barriers
Punj Lloyd Ltd.
10.12.06
64
ERC 1400/D20/ C1
22nd February Street and Al Amir Street Upgrading and Interchange
Public Works Authority, Drainage Affars, Qatar
Ashghal
PVC Lined RC Pipes
Tubin Const. Industry Tourism Trade Co. Inc.
26.12.06
65
N/A
Qatar Gas 3 & 4 Onshore Projects Utilities, Offsite & Offplot Construction Works
Chiyoda Tchnip Joint Venture- QCS
RC Pipes
GAMA Qatar
18.02.2007
66
-
Inter Reflneries Pipeline (IRP) - EPC Implementation, Project Management Consultancy(PMC)Services
TAKREER
Tebodin Consultants
RC Pipes
Dodsal Pte Ltd.
12.06.2007
67
Contract No. 732
Groundwater Lowering at Shawamekh and Sweihan Interchange Storm Water System
N/A
MWH
RC Pipes & Fittings
ADMAC
26.09.2007
68
-
Culture Village (Phase 1) Roads & Infra
Du
Halcrow International partnership
Precast Chamber/Manhole
Sixco
28,09,2007
Owner- Dubai Properties
69
-
Culture Village (Phase 1) Roads & Infra
Du
Halcrow International partnership
JRC 14
Belhasa Six Construct LLC
23,12,2007
Owner- Dubai Properties
70
Civil Project 565
Doha & Rayyan Sewerage Schemes Muraikh Area Drainage & outfall
Infrastructure Affairs Public Works Authority
KEO International Consultants
RC Jacking Pipes
QBC
31.04.2008
71
-
Central Market Re-development - Construction of Utility Services
Government of Abu Dhabi - Public Gardens Directorate (PGD)
Hyder Consulting
RC Pipes
Al Husam General Contracting Est.
07.05.2008
72
PD017
DS 161 Pumping Station X1 and Its Rising Mains
Dubai Municipality drainage and irrigation Department
ACE-Associated Consulting Engg Int
GRP Pipes with RC for NDR works
Hedley International Emirates Industrial Projects LLC
28,07,2008
73
-
Downtown Jebel Ali Infra (PD016)
Limitless
Arup
Etisalat Chember JRC 14
Hedley International Emirates Industrial Projects LLC
14,08,2008
74
Contract No. 509/4
Surface Drainage Works Projects for Al Bahya and Al Sader Areas
PGD
Parsons International Ltd.
RC Standard Pipes & Jacking Pipes
ADMAC
2008
Approval Under Process
75
CP - 682/ 3
Doha North Sewerage Treatment and Associated Worklot 3 Intercept and Truck Sewer Tunnels in Doha, Qatar
Ashghal
KEO Stanley Consultant
RC jacking Pipes
Hedley International Emirates Industrial Projects LLC - Ultra Construction Engg
2008
Approval Under Process
76
-
Saraya Development Abu Dhabi Cornice
-
Rafikel - Khoury & Partners
Etisalat Precast Manholes (JRC 12 & JRC 14)
Al Dhafra Civil Works
21.02.2009
77
Contract No. 2
A'Seeb Waste water Projects
Haya Water
Parsons
RCP Jacking Pipes with GRP Lined
Hedley International Emirates Industrial Projects LLC - Gulf Petrochemical
21,04,2009
78
-
ADCOP Road Crossing (HABSHAN TO FUJARIAH PIPELINE)
ILF Consulting Eng.
International Petroleum Investment Co.
RC Jacking Pipes (Dia 1600/1960mm)
China Petroleum Engineering &Construction Corporation
28,05,2009
79
Project No. UAE 162647A
Masder MIST1A Ancillary
Masder
CH2M HILL / KEO
Precast Crash Barrier
Taahud General Contracting
03.06.2009
Document No. 030000-009-001
80
AC 7111
Al Dana Outfall Extension - Al Raha Beach
Al Dar
AECOM
RC Pipes 2400 mm dia.
Dutco Balfour Beatty
04.07.2009
81
Sector 5 & 6
Reem Island Development Infrastructure Works Reem Island
Tamouh
Hyder Consulting
Precsat Manholes (JRC 14 & MRT 9)
Orascom - Contrack JV
12.08.2009


Return to top