SR. NO
|
PROJ. NO.
|
PROJECT DESCRIPTION
|
CLIENT
|
CONSULTANT
|
PRODUCT
|
CONTRACTOR
|
APPROVAL DATE
|
REMARK
|
1
|
ADSS-216/B
|
Khalifa City 'B' - Surface Water Drainage |
Abu Dhabi Municipality - SPC
|
Acer John Taylor
|
PVC Lined RC Pipe 2400 mm
|
Bin Hafeez Est.
|
12.03.1998
|
|
2
|
C-962
|
Internal Road Project for Mussafah Industrial Area, Contract No. 962 |
Abu Dhabi Municipality
|
Hyder Consulting
|
R.C. Pipe 2400 mm
|
Bin Hafeez Est.
|
08.12.1998
|
|
3
|
ADSS 431
|
Sewerage & Stormwater Project for New Mussafah East - Phase IV |
Abu Dhabi Municipality - SPC
|
Dorsch Consult
|
RC Pipe 600 & 1000 mm
|
Bin Hafeez Est.
|
21.04.1999
|
|
4
|
ADSS 219/B
|
Khalifa City B Sewerage Works & Surface Water Truch Lines |
Abu Dhabi Municipality - SPC
|
Hyder Consulting
|
HDPE Lined RC Pipes 600mm to 2400mm dia.
|
Nael & Bin Harmal Hydroexport Est.
|
25.04.1999
|
|
5
|
ADSS 502/1
|
Sewerage & Surface Drainage System & Facilities at South Shahama Area |
Abu Dhabi Municipality - SPC
|
Parsons International Ltd.
|
PVC Lined RC Pipes 2400 mm dia.
|
Bin Hafeez Est.
|
10.05.1999
|
|
6
|
-
|
Borouge Petrochemical Project |
Borouge (ADNOC)
|
Various
|
Precast Concrete Pipe
|
Al Jaber Energy Service
|
01.08.1999
|
|
7
|
-
|
General |
Al Ain Municipality
|
--
|
R.C. Pipe (Full range)
|
General
|
08.02.2000
|
|
8
|
M16A/A
|
Roads & Sewerage in Mezyad, Al Dhaher & Umm Ghafa Extensions |
Al Ain Municipality
|
Gibb Middle East
|
RC Pipe 600 mm to 1400 mm dia.
|
Bin Hafeez Est.
|
08.05.2000
|
|
9
|
ADSS 515/5
|
Surface Drainage for Airport Road Interchange, Amiri Flight Road and Gold Course |
Abu Dhabi Municipality - SPC
|
Parsons International Ltd.
|
HDPE Lined RC Pipe 600 to 1500 mm dia.
|
Bin Hafeez Est.
|
12.09.2000
|
|
10
|
ADSS 515/4
|
Storm Water Drainage along both of Al Ain Road - Second Stage (From Interchange No. 5 to Mafraq Interchange) |
Abu Dhabi Municipality - SPC
|
Parsons International Ltd.
|
HDPE Lined RC Pipe 600 to 1400 mm dia.
|
Bin Hafeez Est.
|
09.04.2001
|
|
11
|
CP 565/1
|
Project Code DSC 0040, Surface Water Schemes - Abu Hamour Area Drainage - Phase 2 |
Drainage Dept., Qatar
|
Khatib & Alami and Metcalf & Eddy International, Inc.
|
RC Pipe 1300 & 1400 mm
|
Al Waha Est.
|
23.08.2001
|
|
12
|
Trip Cont. No. 2015
|
New Corniche Road East (Stage I) Land Reclamation and Roadworks |
Abu Dhabi Municipality
|
De Leuw, Cather Int'l Ltd.
|
R.C. Pipe - Dia. 600, 800, 1300 & 1800mm
|
BM Engineering and Construction Co. Ltd.
|
14.04.2004
|
|
13
|
-
|
Dubai World Trade Centre Storm Water Drainage Project |
Dubai World Trade Centre
|
Hyder Consulting
|
RC Pipe, 600, 800 & 1000 mm dia.
|
Hedley International Emirates Industrial Projects LLC
|
11.05.2002
|
|
14
|
-
|
Dubai World Trade Centre Storm Water Drainage Project |
Dubai World Trade Centre
|
Hyder Consulting
|
Precast Manholes
|
Hedley International Emirates Industrial Projects LLC
|
01.06.2002
|
|
15
|
CP 677
|
DFC 0363 - Doha and Rayyan Sewerage PS 3, 18 Area Sewerage |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
Maunsell Consultantcy Services Ltd.
|
RC/GRP Lined Jacking Pipe, 800 mm dia.
|
Al Waha Est. for Contg. & Trading
|
15.09.2002
|
|
16
|
CP 393
|
Project Code DTC 0065, Industrial Area Sewerage Treatment Works |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
Khatib & Alami and Metcalf & Eddy International, Inc.
|
RC Pipes 1000 mm dia.
|
Razak Trading & Contracting Co.
|
04.12.2002
|
|
17
|
ERC 0492/C1
|
Al Gharrafa Interchange |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
Technital
|
PVC Lined RC Pipes 700 mm to 1000 mm dia.
|
J&P (Overseas) Qatar WLL
|
18.12.2002
|
|
18
|
BP#1C-1
|
Construction of Roads, Underground Parking, Utility Tunnels and Utilities |
Qatar Petroleum
|
KEO International Consultants
|
RC Jacking Pipe 1500 mm dia.
|
Al Darwish Engg/Contrack International Inc. J.V.
|
26.03.2003
|
|
19
|
Trip Cont. No. 994
|
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A |
Abu Dhabi Municipality
|
De Leuw, Cather Int'l Ltd.
|
RC Pipes 800 mm
|
Bin Hafeez Est.
|
27.04.2003
|
|
20
|
Trip Cont. No. 994
|
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A |
Abu Dhabi Municipality
|
De Leuw, Cather Int'l Ltd.
|
RC Pipes 1800mm
|
Bin Hafeez Est.
|
29.04.2003
|
|
21
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Municipality
|
Montgomery Watson Harza
|
HDPE Liner RC Pipes 2400 mm dia.
|
Bin Hafeez Est.
|
05.05.2003
|
|
22
|
ADSS 408/2
|
Surface Water Drainage from Truck Road to Al Wathba Palace Civil Works (Phase II) |
Abu Dhabi Municipality
|
Dorsch Consult
|
RC Jacking Pipe 1200 mm dia.
|
ADMAK
|
25.05.2003
|
|
23
|
-
|
Amiri Flight Airfield Expansion Package No. 002 -Apron and Taaxiways |
Amiri Flight
|
Halcrow International partnership
|
RC Pipes, 600 mm to 1300 mm dia.
|
Six Construct Co. Ltd.
|
27.05.2003
|
|
24
|
-
|
Amiri Flight Airfield Expansion Package No. 002 - Apron & Taxiways |
Amiri Flight
|
Halcrow International partnership
|
RC Pipes & Manholes
|
Six Construct Co. Ltd.
|
27.05.2003
|
|
25
|
-
|
General |
Al Ain Municipality
|
N.A.
|
RC Pipes (Full range)
|
General
|
02.06.2003
|
|
26
|
-
|
Amiri Flight Airfield Expansion Package No. 002 - Apron & Taxiways |
Amiri Flight
|
Halcrow International partnership
|
Precast Manholes 1500 mm dia.
|
Six Construct Co. Ltd.
|
03.06.2003
|
|
27
|
Trip Cont. No. 994
|
Bridge Interchange on Abu Dhabi - Al Ain Road at MIP-3A |
Abu Dhabi Municipality
|
De Leuw, Cather Int'l Ltd.
|
RC Jacking Pipes 1800mm
|
Bin Hafeez Est.
|
03.06.2003
|
|
28
|
-
|
General |
Abu Dhabi Water & Electricity Authority
|
N.A.
|
RC Pipes (Full range)
|
General
|
17.06.2003
|
|
29
|
CP 565/2
|
Project Code DSC 0041, Surface Water Schemes - Abu Hamour Area Drainage - Phase 3 |
Ministry of Municipal Affairs & Agriculture - Drainage Dept., Qatar
|
Khatib & Alami and Metcalf & Eddy International, Inc.
|
RC Pipe 1200 mm dia.
|
Qatar Building Co.
|
22.06.2003
|
|
30
|
-
|
Jumeriah Islands (Al Nakheel), Package 6, External Pipelines |
Jebel Ali Properties
|
Maunsell Consultantcy Services Ltd.
|
RC Pipes
|
Hedley International Emirates Industrial Projects LLC
|
12.07.2003
|
|
31
|
ADSS 724
|
Sewerage of Al Shamkha, Phase III |
Abu Dhabi Municipality
|
Montgomery Watson Harza
|
RC Pipes 2400 mm dia.
|
Bin Hafeez Est.
|
12.08.2003
|
|
32
|
JAP005
|
Jumeirah Islands Project, Package 6, External Pipelines |
Jebel Ali Properties
|
ACE International
|
Concrete Casing of GRP Pipes 600 mm dia.
|
Hedley International Emirates Industrial Projects LLC
|
27.09.2003
|
|
33
|
JAP 015/2
|
China Town JAP015/2 - Infrastructures Contract Storm Water Drainage System |
Nakheel
|
ACE International
|
RC Pipes 600, 700, 800 & 1000 mm dia.
|
Al Nabooda & Bin Hafeez
|
27.09.2003
|
|
34
|
P353JA
|
Quay 4 Extension & Berth 21 |
Nakheel
|
Cansult Ltd.
|
RC Pipe 800 mm dia.
|
Belhasa Six Construct LLC
|
06.11.2003
|
|
35
|
GTC 225/ED/03
|
EPC of Dual Carriageway between Umm Bab and Salwa Road |
Qatar Petroleum
|
RC Pipes 1000mm & 1200mm
|
Galfar Al Misnad Engg & Cont. WLL
|
11.01.2004
|
||
36
|
Project 2137
|
Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) - Ruwais |
TAKREER
|
RC Pipes
|
Al Jaber Energy Service
|
03.04.2004
|
||
37
|
Project 2137
|
Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) - Ruwais |
TAKREER
|
RC Jacking Pipes 2400 mm dia.
|
Al Jaber Energy Service
|
03.04.2004
|
||
38
|
ADSS 728
|
Sewerage of Al Shamkha, Phase 6 |
Abu Dhabi Municipality
|
Montgomery Watson Harza
|
Casting, Handling and Erection of Pre-cast Elements.
|
Bin Hafeez Est.
|
18.12.2004
|
|
39
|
3M/04/2
|
Laying of D.I. & A.C. Pipelines in Northern Emirates |
FEWA
|
Precast Cocnrete Pipes for use as pipe culvert
|
Tecton Engg. & Construction LLC
|
30.04.2005
|
||
40
|
CP 451
|
Doha & Rayyan Sewerage Garaffa Trunk Sewer - Phase 1 Contract No. C2005/52 |
ASCO Consulting Engineers
|
RC Jacking Pipes
|
Al Huda Engg. Works (AJECT - Qatar)
|
28.09.2005
|
||
41
|
Development of Road from Inter-Continental R/A to Khatim Al Shakala R/A |
Govt. of Abu Dhabi - Al Ain Municipality
|
Maunsell Consultantcy Services Ltd.
|
RC Pipes
|
Bin Hafeez Est.
|
29.10.2005
|
||
42
|
ERC 0656/C1
|
Suhaim Bin Hamed Street |
Roads Affairs, Public Works Authority, Main Projects Division, Qatar
|
Maunsell Consultantcy Services Ltd.
|
PVC Lined RC Pipes, 2000 mm dia.
|
Al Jaber Engineering
|
17.11.2005
|
|
43
|
IRP6089
|
Inter Refineries Pipelines(IRP) |
TAKREER
|
Tebodin
|
RC Pipes
|
Trident Transport
|
18.12.2005
|
|
44
|
CP 706
|
Hamad Medical City Surface & Ground Water Scheme |
Public Works Authority, Drainage Affars, Qatar
|
KEO International Consultants
|
PVC Lined RC Pipes
|
Al Jaber Engineering
|
09.01.2006
|
|
45
|
ADSS 223
|
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3 |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
R.C. Pipes
|
Bin Hafeez Est.
|
06.02.2006
|
|
46
|
ADSS
|
Relocation of Storm Water Pumping Station RD-G |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
R.C. Pipes
|
Nurol L.L.C.
|
15.02.2006
|
|
47
|
ADSS 223
|
Sewerage and Surface Water Networks at Khalifa Bin Zayed City - Phase 3 |
Government of Abu Dhabi - Sewerage Directorate
|
Hyder Consulting
|
Concrete Pre-cast Units
|
Bin Hafeez Est.
|
18.02.2006
|
|
48
|
CP 451
|
Doha & Rayyan Sewerage Garaffa Trunk Sewer - Phase 1 Contract No. C2005/52 |
Public Works Authority, Drainage Affars, Qatar
|
ASCO Consulting Engineers
|
R.C. Pipes
|
Al Huda Engg. Works
|
18.02.2006
|
|
49
|
Cont. 1
|
Construct, Complete & Maintain the roads in U.A.E. Contract No. 1 - Dhadna, Taween, Khalibeh, Idhen |
Ministry of Public Works - Road Dept. and Utilities
|
Conser Consulting Engg. Services
|
R.C. Pipes
|
Saif Bin Darwish
|
16.05.2006
|
|
50
|
Cont. 1B
|
Rehabilitation, Upgrading & Widening of Abu Dhabi - Dubai Road, Contract 1B |
Works Dept., Emirate of Abu Dhabi
|
Parkman Consultants
|
R.C. Pipes
|
Bin Hafeez Est.
|
07.06.2006
|
|
51
|
-
|
Registration & Prequalification |
TAKREER
|
N.A.
|
R.C. Pipes
|
Direct
|
21.06.2006
|
|
52
|
R800-3A
|
Ras Al Khor Crossing |
Roads & Transport Authority Roads Dept.
|
Parsons, De Leuw Cather Overseas Ltd.
|
Precast Manhole Systems
|
Hedley International Emirates Industrial Projects LLC
|
17.07.2006
|
|
53
|
ERC0638/CIA
|
Construction of Qatar Primary Routes, North Road Project- Package -1 |
Ashghal
|
Dar Al-Handasah
|
PVC lined Concrete Pipe
|
Al Darwish Engg.
|
31.07.2006
|
|
54
|
R800-3A
|
Ras Al Khor Crossing |
Roads & Transport Authority Roads Dept.
|
Parsons, De Leuw Cather Overseas Ltd.
|
Precast Drainage Manhole System
|
Hedley International Emirates Industrial Projects LLC
|
25.08.2006
|
|
55
|
ERC/1400/D20/C4
|
Doha Expressway/D Ring road Interchange (Pkg. 4) |
Roads Affairs Main Projects Division, Qatar
|
Ashghal
|
RC Jacking Pipes
|
Qatar Building Co. /
|
08.07.2006
|
|
56
|
ERC/1400/D20/C2
|
Industrial Interchange |
Roads Affairs Main Projects Division, Qatar
|
Technital
|
RC jacking pipes
|
Konstruktor Inzenjering d.d. Split
|
11.10.06
|
|
57
|
D04110-Pkg. No. 1-N007
|
Jumeirah Village South II -Infrastructure Works |
Ghantoot Gen. Transp. & Cont. Co. (Main Contractor)
|
Dar Al-Handasah
|
Junction Box
|
Reem Cont. Dubai
|
22.10.06
|
|
58
|
Cont. No. 35-50-01-C0030
|
Package CP 403 Dubai Maritime City Infrastucture Contract No. 2 |
Nakheel
|
Mouchelparkman
|
Manhole Systgem DIC Chambers
|
Hedley International Emirates Industrial Projects LLC
|
30.10.06
|
|
59
|
N/A
|
22 February Street / Al Amir Street Upgr. & Int. Doha |
P.W.A.
|
Asghal
|
RC Jacking Pipes
|
JV Bilfinger Berger - Al Hamed (Tubin )
|
28.06.06
|
|
60
|
N/A
|
Central Prison at Sumail |
Royal Oman Police - DGPM
|
Khatib & Alami and Partners
|
RC Pipes
|
Galfar Engg. & Cont. LLC
|
05.11.06
|
|
61
|
N/A
|
Onshore Gas Dev. Phase III Project, Subcontract No. 25113-000-HC3-P00Z-00002 NGL Pipeline |
GASCO
|
Bechtel
|
Precast Elements
|
Punj Lloyd Ltd.
|
08.11.06
|
|
62
|
N/A
|
General |
Qatar Petroleum
|
N/A
|
R.C. / GRP / uPVC Pipes & Fittings
|
Direct
|
29.11.06
|
|
63
|
DCA-06-01
|
EGDS Upgrade Works Project |
GASCO
|
Bechtel
|
FOC Chambers and Concrete Safety Barriers
|
Punj Lloyd Ltd.
|
10.12.06
|
|
64
|
ERC 1400/D20/ C1
|
22nd February Street and Al Amir Street Upgrading and Interchange |
Public Works Authority, Drainage Affars, Qatar
|
Ashghal
|
PVC Lined RC Pipes
|
Tubin Const. Industry Tourism Trade Co. Inc.
|
26.12.06
|
|
65
|
N/A
|
Qatar Gas 3 & 4 Onshore Projects Utilities, Offsite & Offplot Construction Works |
Chiyoda Tchnip Joint Venture- QCS
|
RC Pipes
|
GAMA Qatar
|
18.02.2007
|
||
66
|
-
|
Inter Reflneries Pipeline (IRP) - EPC Implementation, Project Management Consultancy(PMC)Services |
TAKREER
|
Tebodin Consultants
|
RC Pipes
|
Dodsal Pte Ltd.
|
12.06.2007
|
|
67
|
Contract No. 732
|
Groundwater Lowering at Shawamekh and Sweihan Interchange Storm Water System |
N/A
|
MWH
|
RC Pipes & Fittings
|
ADMAC
|
26.09.2007
|
|
68
|
-
|
Culture Village (Phase 1) Roads & Infra |
Du
|
Halcrow International partnership
|
Precast Chamber/Manhole
|
Sixco
|
28,09,2007
|
Owner- Dubai Properties
|
69
|
-
|
Culture Village (Phase 1) Roads & Infra |
Du
|
Halcrow International partnership
|
JRC 14
|
Belhasa Six Construct LLC
|
23,12,2007
|
Owner- Dubai Properties
|
70
|
Civil Project 565
|
Doha & Rayyan Sewerage Schemes Muraikh Area Drainage & outfall |
Infrastructure Affairs Public Works Authority
|
KEO International Consultants
|
RC Jacking Pipes
|
QBC
|
31.04.2008
|
|
71
|
-
|
Central Market Re-development - Construction of Utility Services |
Government of Abu Dhabi - Public Gardens Directorate (PGD)
|
Hyder Consulting
|
RC Pipes
|
Al Husam General Contracting Est.
|
07.05.2008
|
|
72
|
PD017
|
DS 161 Pumping Station X1 and Its Rising Mains |
Dubai Municipality drainage and irrigation Department
|
ACE-Associated Consulting Engg Int
|
GRP Pipes with RC for NDR works
|
Hedley International Emirates Industrial Projects LLC
|
28,07,2008
|
|
73
|
-
|
Downtown Jebel Ali Infra (PD016) |
Limitless
|
Arup
|
Etisalat Chember JRC 14
|
Hedley International Emirates Industrial Projects LLC
|
14,08,2008
|
|
74
|
Contract No. 509/4
|
Surface Drainage Works Projects for Al Bahya and Al Sader Areas |
PGD
|
Parsons International Ltd.
|
RC Standard Pipes & Jacking Pipes
|
ADMAC
|
2008
|
Approval Under Process
|
75
|
CP - 682/ 3
|
Doha North Sewerage Treatment and Associated Worklot 3 Intercept and Truck Sewer Tunnels in Doha, Qatar |
Ashghal
|
KEO Stanley Consultant
|
RC jacking Pipes
|
Hedley International Emirates Industrial Projects LLC - Ultra Construction Engg
|
2008
|
Approval Under Process
|
76
|
-
|
Saraya Development Abu Dhabi Cornice |
-
|
Rafikel - Khoury & Partners
|
Etisalat Precast Manholes (JRC 12 & JRC 14)
|
Al Dhafra Civil Works
|
21.02.2009
|
|
77
|
Contract No. 2
|
A'Seeb Waste water Projects |
Haya Water
|
Parsons
|
RCP Jacking Pipes with GRP Lined
|
Hedley International Emirates Industrial Projects LLC - Gulf Petrochemical
|
21,04,2009
|
|
78
|
-
|
ADCOP Road Crossing (HABSHAN TO FUJARIAH PIPELINE) |
ILF Consulting Eng.
|
International Petroleum Investment Co.
|
RC Jacking Pipes (Dia 1600/1960mm)
|
China Petroleum Engineering &Construction Corporation
|
28,05,2009
|
|
79
|
Project No. UAE 162647A
|
Masder MIST1A Ancillary |
Masder
|
CH2M HILL / KEO
|
Precast Crash Barrier
|
Taahud General Contracting
|
03.06.2009
|
Document No. 030000-009-001
|
80
|
AC 7111
|
Al Dana Outfall Extension - Al Raha Beach |
Al Dar
|
AECOM
|
RC Pipes 2400 mm dia.
|
Dutco Balfour Beatty
|
04.07.2009
|
|
81
|
Sector 5 & 6
|
Reem Island Development Infrastructure Works Reem Island |
Tamouh
|
Hyder Consulting
|
Precsat Manholes (JRC 14 & MRT 9)
|
Orascom - Contrack JV
|
12.08.2009
|